Long leadset for Stress system. 10-lead, AAMI color-coding, grabbers.


Product Overview

Long leadset for Stress system. 10
NOUN - 12L Leadset, Grabber, AAMI Long


Device Description

A collection of noninvasive devices intended to conduct electrical signals from a patient's heart, via an electrode attached to the surface of the chest/limbs, to an electrocardiograph (ECG) machine or a patient monitoring system. It is designed as an insulated wire(s), which may additionally include a detachable or permanently attached electrode and/or cable with connector. Some types may be designed as a pre-configured array (e.g., EEG belt) to assist electrode placement. This is a reusable device.


Environmental Conditions

No Data Available


Device Sizes

No Data Available


Device Sterilization

Device Sterile: False

Sterilization Prior To Use: False

Sterilization Methods: No Data Available


Product Codes

Code: DSA

Device Name: Cable, Transducer And Electrode, Patient, (Including Connector)

Device Class: 2

Physical State: N/A

Definition: N/A

Submission Type ID: 1

Review Panel: CV

Review Code: N/A

Technical Method: N

Gmp Exempt Flag: N/A

Life Sustain Support Flag: N

Unclassified Reason: N/A

Implant Flag: N

Target Area: N/A

Regulation Number: 870.2900

Third Party Flag: Y

Medical Specialty: CV


Device Identifiers

Device Id: 00884838029156

Device Type: Primary

DeviceId Issuing Agency: GS1

Contains DI Number: N/A

Package Quantity: N/A

Package Discontinue Date: N/A

Package Status: N/A

Package Type: N/A


GMDN ®. © GMDN Agency 2005-2024.
Educational Resources
Videos