PageWriter TC70 US Government all
PageWriter - TC70 government Bundle w trolley
Device Description
A device intended to be used by a healthcare professional in a clinical setting to acquire and process the electrical activity of the heart for digital display in the form of a graph, to assist a physician in assessing electrical cardiac physiology [electrocardiography (ECG)]. It is designed for recording the electrical signal from two or more configurations of electrodes (ECG-leads) at a time (multichannel) and may be intended for resting ECG and/or stress/exercise ECG. It will either include an integrated display or be designed to transmit ECG data to an off-the-shelf device for display; ECG electrodes may be included. Data interpretation and/or telemetry features might also be included.
Environmental Conditions
No Data Available
Device Sizes
No Data Available
Device Sterilization
Device Sterile: False
Sterilization Prior To Use: False
Sterilization Methods: No Data Available
Product Codes
Code: DPS
Device Name: Electrocardiograph
Device Class: 2
Physical State: N/A
Definition: N/A
Submission Type ID: 1
Review Panel: CV
Review Code: N/A
Technical Method: N
Gmp Exempt Flag: N/A
Life Sustain Support Flag: N
Unclassified Reason: N/A
Implant Flag: N
Target Area: N/A
Regulation Number: 870.2340
Third Party Flag: Y
Medical Specialty: CV
Device Identifiers
Device Id: 00884838032514
Device Type: Primary
DeviceId Issuing Agency: GS1
Contains DI Number: N/A
Package Quantity: N/A
Package Discontinue Date: N/A
Package Status: N/A
Package Type: N/A